
Brad Bettes (DSO) takes a break from drilling at Valley Hope in Cushing, OK
Red Rock Consulting and DSO drilled a project at Valley Hope in Cushing, Oklahoma in April, 2010. While Brad was not admitted, he did think the fried chicken dinner sounded tasty.
The project included a three story addition to a building that was originally the home of a local oil baron built in the 1920’s.

Valley Hope Treatment Facility